A Webflow Website That Grows with You: 42watt

For 42watt, we developed the website in Webflow as part of the rebranding. Today, the team extends the blog and landing pages on its own.

Reading time
4
Minutes
Projects
Jakob Wiemer

Founder and Head of Development

Published
23
.
10
.
2026
Table of Contents
Key takeaways
  • 42watt is a Munich-based cleantech start-up for the energy-efficient renovation of residential buildings. In 2026, OBI acquired a majority stake.
  • Branding, design and content came from 42watt, and we developed the website in Webflow.
  • Development took about six to eight weeks, and the launch was in Q1 2026.
  • The blog now has more than 400 articles, and the website gets five-figure monthly traffic.
  • Since launch, the team has built or tested 10 to 15 landing pages on its own.
Über
42watt

42watt is a Munich-based cleantech startup and a digital one-stop shop for the energy-efficient renovation of residential buildings, ranging from heat pumps to photovoltaics. Customers primarily discover 42watt online, with the company's 377-article blog serving as one of its most important channels. In 2026, OBI acquired a majority stake in 42watt.

Type
Scale-up
Industry
Energy
Market
DACH
Employees
~ 55

How do you build a website that a marketing team can keep developing on its own after launch? With a structure designed for growth: a blog that grows with you, and landing pages built from ready-made building blocks. For 42watt, we built exactly that in Webflow.

‍

Who is 42watt?

A Munich-based cleantech start-up and a digital one-stop shop for the energy-efficient renovation of residential buildings. From heat pumps to photovoltaics, 42watt guides homeowners through the entire process. Customers mainly find the company online. In 2026, OBI acquired a majority stake in 42watt.

‍

Who did what?

Branding, design and content came from 42watt, development in Webflow from us. The website was created as part of a rebranding, and we had already developed the previous site as well. During the build, we contributed design ideas in many places, for example on animations and layouts. Development took about six to eight weeks, and the launch was in Q1 2026.

‍

What was the requirement?

A website the team can extend without developers. 42watt publishes new blog articles every week and regularly tests new landing pages. If every new page needs a developer, the website becomes a bottleneck. That's why we built two systems that prevent exactly that.

‍

How is the website structured?

Around two systems: a blog for reach and landing pages for leads.

  • The blog: Seven categories, one per product or service, with topics within each category. Every article can embed a configurator and leads to a matching landing page at the end. More on this in the article A Blog with 400+ Articles That Grows with You.
  • The landing pages: Recurring sections like testimonials, logos, Google reviews or the process are set up as Webflow Components. The team assembles new pages from them. More on this in the article Landing Pages Without Developers.

‍

What has changed for 42watt?

Today, the team largely extends the website on its own. The blog has grown to more than 400 articles, and the website gets five-figure monthly traffic. Since launch, 10 to 15 landing pages have been built or tested without us. For new features and larger extensions, 42watt still gets in touch with us regularly.

Jakob supported us from the setup through the ongoing expansion of our Webflow presence. We appreciate his fast response time, his flexibility and his efficient way of working. Working together is simply fun! (translated from German)

‍

What can you take away from this?

Build your website for the time after launch. Three points:

  1. Clear responsibilities. At 42watt, brand and content came from the team, development from us. That makes projects fast.
  2. Systems instead of individual pages. If you regularly need new pages, build building blocks, not finished pages.
  3. Plan the handover. A CMS nobody understands helps nobody. Short videos on how to use it save a lot of questions later.

Frequently Asked Questions about this topic

Can a Webflow website grow along with a rebranding?

Yes, if it's built cleanly. At 42watt, we redeveloped the website as part of a rebranding and structured it so that the team has been extending pages, articles and landing pages on its own ever since.

How much maintenance does a Webflow website need after launch?

If it's well built, little developer time. The marketing team maintains content, articles and new landing pages on its own. A developer is mainly needed for new features or larger extensions.

Do you need a large team for a Webflow website?

No. A single developer built the 42watt website in about six to eight weeks, while branding, design and content came from the 42watt team. What matters is clear responsibilities.

Jakob Wiemer

Founder and Head of Development at Double Play. 3× Awwwards SOTD winner.

Explore more articles

Webflow

Landing Pages Without Developers: Webflow Components in Practice

Conversion & Strategy

A Real Estate Agent Website That Wins Over Sellers: Story-Selling at yuvaris

Studio

AI in the Web Design Process: Where It Speeds Us Up and Where It Doesn't